| 1. | Influence on strata deformation for staged construction of excavation in soft clay 软土基坑分步开挖时地层移动规律探讨 |
| 2. | Risk analysis on pre - stage construction schedule of tunnels for laxiwa hydropower project 戈兰滩水电站施工前期设计与施工回顾 |
| 3. | Based on the study , some advices to the staged construction project are suggested 在研究总结的基础上,提出了转换层的阶段施工方案。 |
| 4. | Next , the simulation experiment of the whole staged construction process of the steel truss transfer story is conducted 对钢桁架转换层阶段施工的全过程进行了模拟试验研究。 |
| 5. | A staged construction similar to that currently proposed for the implementation of the project will be required , even for the immersed tube tunnel option -沉管隧道方案必须分段施工与目前的工程计划建议相类似。 |
| 6. | Thermal power plant of tianfu co . ltd . which is established in 1985 has a electricity capacity of 51mw and a 485t / h steam capacity through three stage constructions 天富热电股份有限公司热电厂始建于一九八五年,历经三期建设形成51mw的发电装机容量,锅炉总计485t h的蒸发量。 |
| 7. | According to the situation that the map cracking appears in some fill section in the first stage construction of the connecting line of bay bridge in zhanjiang city , this paper makes the experimental analysis on it and advances some corresponding measures 根据湛江海湾大桥连接线一期工程某些填方路段出现龟裂的情况,进行了试验分析并提出了相应措施。 |
| 8. | With the consideration of soil - structure interaction , process of multi - staged construction , a plane fem model for simulating excavation is established , which is used to analyze and discuss the behaviors of excavation 在考虑土与结构相互作用的基础上,采用二维平面有限元法建立了深基坑有限元模型,并模拟其复杂的分步开挖过程,对基坑性状的进行了分析和探讨。 |
| 9. | The project content : construct first production line for period 102 thousand tons per year ; the consequence will be started when the surrounding bamboo source develops in scale to guanrentee the enough material for the second stage construction 项目内容:建设首期10 . 2万吨/年漂白竹浆生产线;待项目建设及周边竹材资源有更大发展时,能保证第二期项目建设原料之需时,建设第二期项目。 |
| 10. | The first - stage construction of dayaowan has formed a region about 1 km2 by dredging . in this area , because the dredging points were set scarcely , soil formed becomes a regional and radial distribution , in which the soft deposits occupies about 40 % 大窑湾一期工程利用疏浚吹填形成了约1km的区域,在此区域中,由于设置的吹填点较少,形成的土质呈区域性放射形分布,软基占40左右。 |